Traffic, Bicycle and Pedestrian Improvements (18/19)

Print
Press Enter to show all options, press Tab go to next option

 Image of Oak Grove at Entrada Improvements Map 

Project Overview

Description

As areas of interest are identified, CIP # 15-016 “Traffic, Bicycle and Pedestrian Improvements” project allows staff to implement traffic calming features, crosswalk/walkway enhancements, bicycle facilities, and traffic congestion relief measures on a case by case basis at various locations citywide, where such installations are not feasible or economical as part of another CIP project or through routine maintenance. 

This proposed construction project will consist of construction of sidewalk, curb & gutter, upgrade ADA curb ramps and accessibility features, median pedestrian refuge as well as updated striping, signs, pavement markings and reconfiguration of parking stalls and pavement markings.


Locations

•             Novato Boulevard at Thorsson Court; 
•             Vallejo Avenue at 4th Street; 
•             Vallejo Avenue at 2nd Street; 
•             2nd, 3rd, 4th, 5th & 6th Streets between Grant Avenue and Vallejo Avenue; 
•             Front Street between Diablo Avenue and First Street; 
•             Hill Road between Indian Valley Road and Tamalpais Avenue; 
•             Leafwood Drive at School Crossing; 
•             Entrada Drive at Oak Grove Drive; 
•             Entrada Drive between Oak Grove Drive and Enfrente Road;
•             Digital Drive at Galli Drive and Digital Drive at Leveroni Court; 
•             Main Gate Road at Randolph Drive; 
•             Hamilton Parkway between Palm Drive and South Palm Drive (MOCA).

View project location on an interactive map >>


Benefit

Vehicular, pedestrian and bicyclist traffic safety. 


 Schedule

Construction work is anticipates to start in Fall 2019, and should last approximately two months.


Cost

Construction Contract for this phase (19/20) is $285,900 and funding sources are Long Term Maintenance and SB1 Gas Tax. 


Contact Info

Project Manager
Petr Skala
415.899.8237
pskala@novato.org

Public Works Department
415.899.8246
pw@novato.org

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer